PROGRAM PROPOSAL

Duration: 10 weeks

Concept: Focus on the introduction and implementation of the 5S (lean) housekeeping method on-site.

What can be expected?

  • Briefing at the start of every phase.
  • Team meetings to plan each phase.
  • Active participation.
  • Reflection and improvement.
  • Visual proof of successes.
  • Sharing Lessons.

Week 1: Introduction

Week 2 - 3: Sort

  • Separate necessary items from unnecessary items. Identify what you need and what you do not.
  • Take unused items to red-tag area.

Week 4 - 5: Set in order

  • Optimally organise needed items in the storage/work area and label them.
  • Make the space self-explanatory.

Week 5: Shine

  • Thoroughly clean relevant work items and the surrounding environment.
  • Keep the workplace spotless!

Week 6 - 8: Standardise

  • Standardise work procedures in order to ensure correct material flow.
  • Maintain equipment and tools.

Week 9 - 10: Sustain

  • Discipline! Continuous application of the previous steps to maintain a well organised workplace.
  • Make it a habit!

Debrief/feedback session at the end of the 10th week (via the Housekeeping campaign feedback form using this link).

Result of the campaign:

  • Reduce waste.
  • Increase productivity.
  • Optimize space & Increase efficiency.
  • Reduce accidents.

Wishing you much success with the Campaign!

Download from our library

Housekeeping campaign

Housekeeping Campaign